Under the Erie Railroad

One hundred years ago, Jamestown had a big traffic problem on its hands. Over 50 trains passed through the bustling city of 40,000 on a daily basis -- trains that utilized 13 separate at-grade crossings where they competed with a growing number of cars, trucks, pedestrians, and a busy streetcar system. The railroad's east-west route through the middle of the city -- paralleling the course of the Chadakoin River -- meant that almost anyone who traveled between the north and south sides of the city had to wait patiently for tracks to clear and traffic to flow. 

The inconvenience and danger that the busy at-grade crossings posed to city residents, as well as the liabilities they posed to the Erie Railroad, brought about a project to separate train traffic from other city traffic through a system of bridges and tunnels. The effort was launched in 1912, with costs divided between the railroad (50%), the city (25%), and the New York State Public Service Commission (25%). However, due to incompetent contractors and World War I, much of the work didn't begin until the mid 1920s. The project finished in 1927, with one additional project (the Fairmount Avenue Pedestrian Subway) added in 1936 to coincide with the construction of the Sixth Street Bridge. 

This annotated gallery provides a glimpse of the bridges and tunnels that provide almost complete grade separation for the Erie Railroad in Jamestown. Today, the only streets within the city limits where vehicles must cross an active railroad track are Tiffany Avenue and Lister Street. 

Published on by Peter Lombardi.